Guide · DISCO paperwork · Intermediate · Pakistan 2026
MEPCO does not sell a green meter on Hall Road. It sells a demand notice.
MEPCO files new grid-tied plants as net-billing after 9 Feb 2026. Export ~Rs 11, import at slab. Street wait talk is 8–16 weeks+. Cities: Multan, Bahawalpur, DG Khan, Sahiwal, RYK. Heat and dust first. Agri and house files mix. Confirm circle office, not a WhatsApp agent.
People also search mepco net metering mepco solar demand notice
Key takeaways
- You bring CNIC, latest MEPCO bill, ownership or owner NOC, photos, their form.
- DISCO: MEPCO — Multan, Bahawalpur, DG Khan, Sahiwal, RYK.
- Street wait: 8–16 weeks+ — Not an SLA.
- Export: ~Rs 11/kWh — Net-billing.
- Photograph the MEPCO bill load before the quote.
What it is
You bring CNIC, latest MEPCO bill, ownership or owner NOC, photos, their form. Installer brings SLD, inverter anti-islanding sheet, flash/serials, earthing test. Then inspection → demand notice → you pay MEPCO → meter swap → connection order.
In Pakistan 2026
Shop SKU “green meter Rs 18,500” is not the MEPCO demand notice. Grandfathered 1:1 only if the agreement was executed before 9 Feb 2026. Plant kW cannot exceed sanctioned load. Sample city page: Multan.
How we spec it
Photograph the MEPCO bill load before the quote. If you need more kW, start load increase in parallel. DHA/CDA/cantonment NOCs do not replace MEPCO. ≤25 kW: DISCO path, not a separate NEPRA sticker from a shop.
Numbers you can actually use
Street ranges, not a quotation. Confirm the carton the week you book.
| Thing | 2026 number | How to use it |
|---|---|---|
| DISCO | MEPCO | Multan, Bahawalpur, DG Khan, Sahiwal, RYK |
| Street wait | 8–16 weeks+ | Not an SLA |
| Export | ~Rs 11/kWh | Net-billing |
| Cap | ≤ sanctioned load | Max 1 MW |
Do this in order
- Read sanctioned load on the MEPCO bill.
- Collect CNIC, ownership, photos.
- Installer: SLD, datasheets, flash, earth test.
- Submit to MEPCO, track inspection.
- Pay demand notice to the DISCO, not WhatsApp.
What the demand notice is
A MEPCO demand notice is their price for the meter, security and whatever that circle is charging this year. It is not a shop accessory. Paying it to an agent without a receipt in your name is how files vanish.
After the meter
App export and DISCO export should be cousins, not strangers. First three bills: check the export column. If MEPCO shows zero export and the dongle shows export, photograph both the same hour and go to the circle, not Facebook.
Worked example — Lahore
Take a 3.6 kW-class hybrid in Lahore (LESCO, ~5.1 PSH). 6 × 645 W is 3.87 kW DC. Derated yield ≈ 3.87 × 5.1 × 0.78 ≈ 15.4 kWh on a clean day — then smog film and a 6–12 week file. This page (MEPCO net-billing) is the piece of that plant people skip on WhatsApp. If your quote cannot survive this Lahore sentence, it will not survive May. Open the calculator with city set to Lahore, and the lookup map for a stocking dealer — not a green-meter SKU.
Keywords this lesson actually answers
People land here asking mepco net metering, mepco solar, demand notice. The honest 2026 answers still collapse to: N-type plates with flash, IP65 hybrid with GRID vs LOAD, 51.2 V LFP on CAN, 14 SWG, XLPO, derate 0.78, and net-billing at ~Rs 11 export if you file with LESCO. Everything else on this page is how not to get robbed while buying those things.
Internal links worth clicking before you pay
Size: system sizing · Policy: net-billing · Battery: LFP · Buy: checklist · Shops: near you · City climate: Lahore · Numbers: calculators.
How shops fail this
1
1 promised on a new MEPCO file
Demand notice paid to the shop
Demand notice paid to the shop
Tenant filing with no owner
Tenant filing with no owner
FAQ — MEPCO net-billing
How long does MEPCO take?
Installer-floor talk 8–16 weeks+. Yours can be worse. We do not sell 15-day guarantees.
Can I export without filing?
Not legally. Hybrid can self-consume without export.
Is KE different from MEPCO?
K-Electric is its own utility. Everyone else is a PEPCO-world DISCO with local habits.
What if my old meter is 1:1?
Agreement date wins. Get it in writing before you expand.
Read next
Net-billing
Net-billing is rupees, not a 1:1 unit swap.
glossarySanctioned load
Sanctioned load is the DISCO cap on your solar size.
guideHow to apply for LESCO net-billing
LESCO is a file. Hall Road is a shop.
glossaryNAEPP
NAEPP is the cheap number they buy your noon extra at.
guideLESCO net-billing
LESCO does not sell a green meter on Hall Road. It sells a demand notice.
guideK-Electric net-billing
K-Electric does not sell a green meter on Hall Road. It sells a demand notice.
All DISCOs Shops near you All lessons
Educational page, September 2026. Not a DISCO filing, not a live quotation, not medical or bank advice. SRO 251(I)/2026 net-billing for new files after 9 Feb 2026.