Sanctioned load is the DISCO cap on your solar size.
Sanctioned load is the kW the DISCO agreed to supply your meter. It is printed on the bill. Net-billing plant size cannot exceed it (and cannot exceed 1 MW anyway).
People also search sanctioned load lesco load extension kva bill
Key takeaways
- A 5 kW sanctioned house cannot legally file 10 kW.
- Where: On the bill — kW or kVA — check.
- Solar cap: ≤ sanctioned — New files 2026.
- Increase: DISCO file — Not a shop form.
- Photograph the bill load before the quote.
What it is
A 5 kW sanctioned house cannot legally file 10 kW. Shops still quote 10 kW “for future AC.” That future is a load-increase file, fees, maybe 3-phase, then solar.
In Pakistan 2026
Tenants: the owner’s load and the owner’s roof. Your bill name must match the story the DISCO will accept, or you get a NOC maze.
How we spec it
Photograph the bill load before the quote. If you need more kW, start the load increase in parallel — it is often slower than the shop promises.
Numbers you can actually use
Street ranges, not a quotation. Confirm the carton the week you book.
| Thing | 2026 number | How to use it |
|---|---|---|
| Where | On the bill | kW or kVA — check |
| Solar cap | ≤ sanctioned | New files 2026 |
| Increase | DISCO file | Not a shop form |
Worked example — Lahore
Take a 3.6 kW-class hybrid in Lahore (LESCO, ~5.1 PSH). 6 × 645 W is 3.87 kW DC. Derated yield ≈ 3.87 × 5.1 × 0.78 ≈ 15.4 kWh on a clean day — then smog film and a 6–12 week file. This page (Sanctioned load) is the piece of that plant people skip on WhatsApp. If your quote cannot survive this Lahore sentence, it will not survive May. Open the calculator with city set to Lahore, and the lookup map for a stocking dealer — not a green-meter SKU.
Keywords this lesson actually answers
People land here asking sanctioned load lesco, load extension, kva bill. The honest 2026 answers still collapse to: N-type plates with flash, IP65 hybrid with GRID vs LOAD, 51.2 V LFP on CAN, 14 SWG, XLPO, derate 0.78, and net-billing at ~Rs 11 export if you file with LESCO. Everything else on this page is how not to get robbed while buying those things.
Internal links worth clicking before you pay
Size: system sizing · Policy: net-billing · Battery: LFP · Buy: checklist · Shops: near you · City climate: Lahore · Numbers: calculators.
How shops fail this
10 kW solar on 5 kW sanctioned
10 kW solar on 5 kW sanctioned
Ignoring kVA vs kW
Ignoring kVA vs kW
Tenant filing without owner
Tenant filing without owner
FAQ — Sanctioned load
kW or kVA on the bill?
Some print kVA. Power factor makes them differ. Ask the circle office how they cap solar.
Does hybrid without export care?
The DISCO cap is for the file. A non-export hybrid can still exist — illegally exporting is a different sin.
DHA NOC and sanctioned load?
Both. Cantonment/DHA paper does not replace the DISCO cap.
Read next
kW (kilowatt)
kW is how fat the pipe is — not how much you used today.
glossaryNet-billing
Net-billing is rupees, not a 1:1 unit swap.
guideHow to apply for LESCO net-billing
LESCO is a file. Hall Road is a shop.
guideThree-phase vs single-phase solar
8–10 kW on 1-phase is a current story. Mills are 3-phase.
glossaryNet-metering vs net-billing
One word changed. The payback spreadsheet changed more.
glossaryNAEPP
NAEPP is the cheap number they buy your noon extra at.
Open the calculators Shops near you All lessons
Educational page, September 2026. Not a DISCO filing, not a live quotation, not medical or bank advice. SRO 251(I)/2026 net-billing for new files after 9 Feb 2026.