Glossary · Grid & policy · Basic · Pakistan 2026

Sanctioned load is the DISCO cap on your solar size.

Sanctioned load is the kW the DISCO agreed to supply your meter. It is printed on the bill. Net-billing plant size cannot exceed it (and cannot exceed 1 MW anyway).

People also search sanctioned load lesco load extension kva bill

Key takeaways

What it is

A 5 kW sanctioned house cannot legally file 10 kW. Shops still quote 10 kW “for future AC.” That future is a load-increase file, fees, maybe 3-phase, then solar.

In Pakistan 2026

Tenants: the owner’s load and the owner’s roof. Your bill name must match the story the DISCO will accept, or you get a NOC maze.

How we spec it

Photograph the bill load before the quote. If you need more kW, start the load increase in parallel — it is often slower than the shop promises.

Numbers you can actually use

Street ranges, not a quotation. Confirm the carton the week you book.

Thing2026 numberHow to use it
WhereOn the billkW or kVA — check
Solar cap≤ sanctionedNew files 2026
IncreaseDISCO fileNot a shop form

Worked example — Lahore

Take a 3.6 kW-class hybrid in Lahore (LESCO, ~5.1 PSH). 6 × 645 W is 3.87 kW DC. Derated yield ≈ 3.87 × 5.1 × 0.78 ≈ 15.4 kWh on a clean day — then smog film and a 6–12 week file. This page (Sanctioned load) is the piece of that plant people skip on WhatsApp. If your quote cannot survive this Lahore sentence, it will not survive May. Open the calculator with city set to Lahore, and the lookup map for a stocking dealer — not a green-meter SKU.

Keywords this lesson actually answers

People land here asking sanctioned load lesco, load extension, kva bill. The honest 2026 answers still collapse to: N-type plates with flash, IP65 hybrid with GRID vs LOAD, 51.2 V LFP on CAN, 14 SWG, XLPO, derate 0.78, and net-billing at ~Rs 11 export if you file with LESCO. Everything else on this page is how not to get robbed while buying those things.

Internal links worth clicking before you pay

Size: system sizing · Policy: net-billing · Battery: LFP · Buy: checklist · Shops: near you · City climate: Lahore · Numbers: calculators.

How shops fail this

WALK AWAY

10 kW solar on 5 kW sanctioned

10 kW solar on 5 kW sanctioned

WALK AWAY

Ignoring kVA vs kW

Ignoring kVA vs kW

WALK AWAY

Tenant filing without owner

Tenant filing without owner

FAQ — Sanctioned load

kW or kVA on the bill?

Some print kVA. Power factor makes them differ. Ask the circle office how they cap solar.

Does hybrid without export care?

The DISCO cap is for the file. A non-export hybrid can still exist — illegally exporting is a different sin.

DHA NOC and sanctioned load?

Both. Cantonment/DHA paper does not replace the DISCO cap.

Read next

glossary

kW (kilowatt)

kW is how fat the pipe is — not how much you used today.

glossary

Net-billing

Net-billing is rupees, not a 1:1 unit swap.

guide

How to apply for LESCO net-billing

LESCO is a file. Hall Road is a shop.

guide

Three-phase vs single-phase solar

8–10 kW on 1-phase is a current story. Mills are 3-phase.

glossary

Net-metering vs net-billing

One word changed. The payback spreadsheet changed more.

glossary

NAEPP

NAEPP is the cheap number they buy your noon extra at.

Open the calculators Shops near you All lessons

Educational page, September 2026. Not a DISCO filing, not a live quotation, not medical or bank advice. SRO 251(I)/2026 net-billing for new files after 9 Feb 2026.