Twelve calculators · one BOM

Size the system before anyone sells you a “package”.

City sun hours, September 2026 SKUs (Hi-MO X10 645 W default, Dyness 5.12 kWh LFP, net-billing export Rs 11), XLPO cable, 14 SWG iron. Figures are street ranges — confirm live stock. What’s latest this month →

Appliance load

Start from a job, then edit quantities. Hours are per day. What each use case means →

Bill → system size

Uses the tariff slider and monthly bill above. Reverse-engineers kWh, then PV for your city PSH.

Plate count & roof

How many modules, roof area, strings, and plate-only cost for the selected SKU.

Inverter sizing

AC rating from peak load × 1.25, vs selected hybrid/on-grid SKU PV input.

Battery backup

Hybrid vs on-grid vs off-grid

Same plate count. On-grid has no battery. Hybrid adds one 5 kWh LFP. Off-grid adds two.

Wire / voltage drop

Iron / structure

Kits of the selected L2/L3/L4 or rail SKU, plus clamp allowance and elevated adder.

Full BOM quote

Plates + inverter + battery (from night load/hours) + iron + 40 m DC pair + protection + labour.

Turn this into a ticket

ROI & payback

Annual yield from city PSH × derate. Savings assume 75% self-consumption at your tariff.

Tube well / agri

Net-billing check

NEPRA SRO 251(I)/2026 is net-billing. ≤25 kW usually skips concurrence. Green meter price is the DISCO demand notice, not a shop SKU.